Quality Control

  1. Home
  2. Quality Control
Inspection & Process Control

Inspection & Process Control

Applying Automotive Component Quality Management Experience to Precision Component Manufacturing

Over thirty years of batch supply experience for world-class automotive component manufacturers has enabled us to form a quality management method centered on process stability, batch consistency, anomaly prevention, and quality traceability.

EADAmetal applies these quality experiences formed in automotive component projects like ZF and Bosch to the manufacturing of precision hard chrome plated valve stems, plungers, spool pins, and small shaft components.

Continuous Control:

From drawing review, control plans, and blank machining, to hard chrome plating, post-plating grinding, and final inspection, every critical operation is assigned explicit control items, inspection records, and release requirements. Quality is not checked out after the product is completed, but is continuously controlled and verified throughout the entire manufacturing process.

Inspection and Process Control
Quality & Process Control Flow
1
Drawing Review & Control Plan
Drawing Review
& Control Plan
2
Blank Machining & Incoming Check
Blank Machining
& Incoming Check
3
Plating Process Control
Plating Process
Control
4
Post-Plating Machining
Post-Plating
Machining
5
Final Inspection & Release
Final Inspection
& Quality Release
6
Final Inspection & Quality Release
Final Inspection
& Quality Release
7
Packaging & Transport Protection
Packaging &
Transport
Protection

01 | Drawing Review & Control Plan

Clarifying how each process is controlled before production begins.

Upon receiving customer drawings, we first review materials, final sizes, tolerances, plating zones, plating thickness, surface roughness, and packaging and inspection requirements.

Based on final product requirements, we determine:
  • Blank machining dimensions

  • Pre-plating size & allowances

  • Post-plating target dimensions

  • Plating thickness & grinding space

  • Rough & fine grinding allowances

  • Critical product characteristics

  • Inspection methods & sampling rates

  • Anomaly response & release conditions

We establish corresponding control plans based on project requirements, clarifying for each process: What to control, how to test, how much to test, who confirms, and how to handle anomalies.

02 | Blank Machining & Incoming Inspection

Imposing clear requirements and verifying quality for collaborative machining processes.

Blank machining is completed by evaluated collaborative resources. EADAmetal is responsible for drawing versions, process dimensions, allowances, inspection requirements, and final quality release. Sampling rates are determined by product characteristics, volume, and customer requirements. Critical dimensions can adopt tightened inspection or 100% inspection based on project risks.

Clarified to Partners
  • Material grade & state

  • Blank & pre-plate dimensions

  • Steps, grooves, chamfer, threads

  • Critical datums

  • Pre-plate allowances

  • Surface state

  • FAI & in-process inspection reqs

Incoming Confirmation
  • Material certs / incoming lists

  • Material grades & batches

  • Drawing numbers & versions

  • Product quantities

  • Blank appearance & surface state

  • Critical machined dimensions

  • Pre-plate size & grind allowances

  • In-process inspection records

Records Retained
  • First article inspection records

  • In-process sampling records

  • Critical dimension results

  • Last article or batch records

  • Anomaly and rework records

Core Expression: Machining is completed by collaborative resources, but the dimensional chain, inspection requirements, and quality release are always uniformly managed by EADAmetal.

03 | Plating Process Control

Controlling not just the coating thickness, but whether the coating meets subsequent machining and final application requirements.

Before production, we confirm plating zones, non-plating zones, racking methods, target coating thickness, and thickness distribution based on component structure, final dimensions, and functional requirements, and formulate corresponding plating plans.

Key Variable Control During Production

Current density, time, temperature, racking methods/quantities, anode positions, component spacing, and coating thickness distribution are recorded and controlled.

Post-Plating Confirmation

We verify coating thickness, appearance, adhesion status, and key areas to ensure a stable foundation for subsequent processing and final performance.

Core Expression: We focus not only on "plating it on," but also on ensuring the plating layer is genuinely under strict control.

04 | Post-Plating Machining Based on Final Requirements

Achieving final dimensions while maintaining an effective hard chrome layer.

Once the plating is complete, necessary finishing processes are performed according to drawings and final application requirements.

For components with strict dimensions, tolerances, roughness, or fit requirements, we arrange corresponding post-plating machining based on the dimensional chain and machining allowances established earlier. Depending on different component and project requirements, methods may include:

  • Rough grinding, fine grinding, and centerless grinding

  • Polishing and other necessary subsequent finishing processes

Simultaneously Controlled During Machining:
  • Final dimensions & tolerance zone positions

  • Roundness, cylindricity, and coaxiality

  • Surface roughness

  • Effective plating retention amount

At the initial project stage, we pre-plan the relationship among: Pre-plating size → Coating growth → Post-plating machining → Final dimensions. By pre-determining machining allowances and key variables for each link, we reduce repeated machining, rework, and redundant procedures while ensuring final quality, improving manufacturing efficiency, and reducing overall costs.

Core Expression: Hard chrome forms the wear-resistant working layer, and post-plating machining completes the final dimension. Both processes must be controlled according to the same dimensional chain.

05 | Final Comprehensive Inspection

Conducting final verification with the complete component as the inspection object.

After completing machining, surface treatment, and necessary post-plating finishing, components undergo final inspection in accordance with customer drawings, technical specifications, and project control requirements.

Depending on different projects, final inspection may include:
  • Final dimensions and tolerances

  • Geometric requirements such as roundness, cylindricity, and coaxiality

  • Surface roughness

  • Coating thickness and effective plating state

  • Appearance and surface defects

  • Threads, hole positions, and assembly-related dimensions

  • Other key characteristics specified in customer drawings

For critical dimensions, vital performance metrics, and client-designated items, 100% full inspection can be conducted upon request.

The purpose of inspection is to confirm whether the component genuinely satisfies all final drawing and delivery requirements after completing the entire manufacturing workflow.

Only products that pass final inspection and are confirmed qualified are permitted for release and delivery.

Inspection Equipment & Validation

Verifying every manufacturing process with actual inspection results.

Capability Equipment Application
Dimensional Mitutoyo Micrometer, Contour Tracer, Projector Blank size, pre-plate size, post-plate size, final dimensions
Geometric CMM, Cylindricity Tester Roundness, runout, coaxiality, datums
Surface Roughness Tester Pre-plating and post-grinding surface roughness
Coating & Perf. Fischer X-ray, Metallography, Salt Spray, Mitutoyo Hardness, Oven Thickness, variance, post-plate state, adhesion, hardness, material perf.

Packaging & Transport Protection

Preventing new damage to qualified products during packaging and transport.

For hard chrome plated components, the biggest fear is collision damage during transport. EADAmetal has rich transit experience and strictly controls potential bumps in production and transport to prevent damaged finished goods from reaching the customer.

Primary Controls Include:
  • Pre-packaging cleaning and visual confirmation

  • Avoiding direct contact between working surfaces

  • Partitioning, layering, or independent positioning

  • Preventing parts from rolling and colliding

  • Moisture, rust, and vibration protection

  • Verifying packaging quantity and box numbers

  • Confirming drawing numbers, batches, and labels

  • Ensuring packaging strength meets international transport reqs